Back
New article

Blue 8 to 9 Transition Guide - Blue Administrators (Checklist & Overview)

Note - This article focuses on planning and execution (5–10 minute read).

Overview

The transition to Blue 9 follows a structured, guided process designed to ensure continuity of your operations while introducing new capabilities.

This guide outlines:

  • What to expect
  • What to prepare
  • How to ensure a smooth transition

What to expect (at a glance)

  • Your data, reports, and projects remain intact
  • Explorance coordinates the upgrade with your team
  • Existing workflows continue with improved navigation and capabilities
  • Some configuration updates (e.g., URLs, authentication) are required

Blue 9 introduces a modernized structure with dedicated spaces for:

  • Blue Home (end-user access)
  • Blue Administration (project management)
  • System Administration (security and SSO)
  • Home Administration (user experience configuration)

What changes

  • New homepage and navigation model
  • Centralized administration areas
  • Updated authentication and system configuration
  • Improved data validation requirements

These changes are guided and documented, not manual rework.

Your role in the transition

Administrators focus on readiness and validation, not technical migration.

Key responsibilities:

  • Review data quality (user data, formats)
  • Plan upgrade timing (ideally outside active project cycles)
  • Communicate changes (e.g., new URLs if applicable)
  • Validate post-upgrade configuration

Upgrade checklist

Use this checklist as your main preparation guide:

Before upgrade

  • Validate user data (IDs, emails, required fields)
  • Review active projects and plan timing
  • Align internal stakeholders (IT, project owners)
  • Prepare communication for users (if needed)

During upgrade

  • Coordinate with Explorance Support
  • Confirm readiness and timing

After upgrade

  • Validate login and access
  • Confirm emails and notifications
  • Review homepage configuration and messaging
  • Test key workflows and reports

This checklist ensures a predictable, low-risk transition.

Ensuring a smooth transition

  • All projects and reports remain consistent
  • Existing links and workflows continue (with updates where required)
  • Upgrade is supported end-to-end by Explorance
  • Start with the checklist
  • Align with IT early
  • Schedule upgrade during a controlled window

Copyright © 2026

Explorance Inc. All rights reserved.